Murchison Project 2013
The nature of this project required a crane to reach the top of an 11 story building in downtown Wilmington, NC. Along with all the other project details, the team had to coordinate with the city for a closure of a major downtown street while equipment was placed onto and removed from the rooftop.
Murchison Project 2013
The project involved upgrading a pump station on the top of the building, an 11 story historic structure in downtown Wilmington.
Murchison Project 2013
Part of the project involved the installation of a second (backup) tower pump and motor for redundancy on this critical system.
Murchison Project 2013
The HVAC StarPlus team, part of which is shown here, planned and executed the project. We are able to take on many projects other contractors aren't prepared to handle due to size and/or complexity.
Harrelson Building 2011
This was one of our biggest projects for the year. It involved upgrading 2 rooftop packaged systems with custom designed rooftop packaged systems. In addition, in order to alleviate pre-existing noise and vibration issues for top floor clients, custom designed curbs were installed as part of the upgrade.
HVACSP Front Page
home page photos
Commercial Heating, Ventilation and Air Conditioning
It's where we got our start and what we're most proud of. No job is too small, too large, too simple or too complex!
Murchison Project 2013
The nature of this project required a crane to reach the top of an 11 story building in downtown Wilmington, NC. Along with all the other project details, the team had to coordinate with the city for a closure of a major downtown street while equipment was placed onto and removed from the rooftop.
Murchison Project 2013
The project involved upgrading a pump station on the top of the building, an 11 story historic structure in downtown Wilmington.
Murchison Project 2013
Part of the project involved the installation of a second (backup) tower pump and motor for redundancy on this critical system.
Murchison Project 2013
The HVAC StarPlus team, part of which is shown here, planned and executed the project. We are able to take on many projects other contractors aren't prepared to handle due to size and/or complexity.
Harrelson Building 2011
This was one of our biggest projects for the year. It involved upgrading 2 rooftop packaged systems with custom designed rooftop packaged systems. In addition, in order to alleviate pre-existing noise and vibration issues for top floor clients, custom designed curbs were installed as part of the upgrade.